224 Littleton Road Route110
Westford, MA 01886
978-692-3346

Construction and Site Work

Compressor_Doosan_P185_PS_060810

Air Compressor, Towable

Description: 
80 lb compressor, requires a 2" trailer hitch

Rates

4 HRS
$75.00
8 HRS
$110.00

Builders Level

Description: 
Includes a sight level, tripod, and rod

Rates

4 HRS
$30.00
8 HRS
$40.00
Finish_Nailer_Senco_FinishPro_42XP_PSM_060210

Finish Nailer

Rates

4 HRS
$30.00
8 HRS
$35.00
Nailer_Senco_3D010_PS_061510

Framing Nailer (Coil)

Rates

4 HRS
$30.00
8 HRS
$35.00

Man Lift (Niftylift TD34T)

Description: 
Track Drive, Height 34ft, Reach 20ft

Rates

4 HRS
$180.00
8 HRS
$300.00

Measuring Wheel

Rates

8 HRS
$13.00

Mini scaffold (29" x 72")

Rates

4 HRS
$25.00
8 HRS
$32.00
Nailer_Senco_3D010_PS_061510

Roofing Nailer (Coil)

Rates

4 HRS
$30.00
8 HRS
$35.00
Scissor_Lift_Genie_GS1930_PS_052610

Scissor Lift (Genie 1930)

Rates

4 HRS
$100.00
8 HRS
$150.00